Showing posts with label 14th @ Irving. Show all posts
Showing posts with label 14th @ Irving. Show all posts

Monday, September 12, 2022

A full reveal at Zero Irving on 14th Street

As you may have noticed, Zero Irving (formerly the Union Square Tech Training Center, 14 @ Irving and tech hub) on 14th Street is now completely free of scaffolding, a sidewalk bridge, etc. ... providing the final view of the completed 21-story building...
The building, developed jointly by the city's Economic Development Corp. and RAL Development Services, will feature 14 floors of market-rate office space as well as a technology training center, co-working and event spaces on the seven floors beneath.

Zero Irving has reportedly signed several full-floor deals recently, including data analytics software company Sigma Computing Inc. on the ninth floor and B2B payments platform Melio on the 15th and 16th floors. And most recently: Laurel Road, a digital banking platform and brand of KeyBank, leased space for offices on the 11th floor. 

Urbanspace will operate a food hall on the ground level...
A refresher on what to expect with that via the Urbanspace website:
Thirteen vendors will occupy the 10,000-square-foot venue with an outdoor patio. Urbanspace is curating a dynamic lineup of chefs, food entrepreneurs, and exciting new restaurant concepts. The result will be more than a market: it will be a fertile ground for the food community, a place where ideas are shared and creativity and individuality shine. At least 25% of the Food Hall will be reserved for use by first-time entrepreneurs or start-up companies operating for less than four years.
No word on an opening date.

Long contested by local preservationists and community groups, the new building sits on the former site of a P.C. Richard & Son on city-owned property.

Foundation work started here in August 2019.

Monday, July 25, 2022

The fullest full reveal to date at Zero Irving on 14th Street

Workers recently removed the sidewalk bridge from outside the 21-story Zero Irving (formerly the Union Square Tech Training Center, 14 @ Irving and tech hub) on 14th Street...
... providing a near-complete look at the building, developed jointly by the city's Economic Development Corp. and RAL Development Services ... which will feature 14 floors of market-rate office space as well as a technology training center, co-working and event spaces on the seven floors beneath. Urbanspace will operate a food hall on the ground level.

Per the Zero Irving website:
Zero Irving is more than a trophy-class office building, it’s an ecosystem ideally engineered to foster growth, flexibility, productivity, and the evolution of new ideas in Manhattan’s ultimate live/work neighborhood.

Zero Irving has reportedly signed several full-floor deals recently, including data analytics software company Sigma Computing Inc. on the ninth floor and B2B payments platform Melio on the 15th and 16th floors. And most recently: Laurel Road, a digital banking platform and brand of KeyBank, leased space for offices on the 11th floor. 

Long contested by local preservationists and community groups, the new building sits on the former site of a P.C. Richard & Son on city-owned property.

Foundation work started here in August 2019.

Tuesday, December 28, 2021

ICYMI: Zero Irving signs up first tenant

An announcement from earlier this month... Melio, a "B2B payments platform for small businesses," is the first tenant for Zero Irving (formerly the Union Square Tech Training Center, 14 @ Irving and tech hub) on 14th Street. 

According to various published reports and a news release, Melio leased 25,000 square feet of office space across the 15th and 16th floors for use as its global HQ. The company, said to be valued at $4 billion, is relocating here from a WeWorks property on West 18th Street.

The building, developed jointly by the city's Economic Development Corp. and RAL Development Services, will feature 14 floors of market-rate office space as well as "a technology training center and incubator, co-working spaces and state-of-the-art event space ... on the seven floors beneath," per the Zero Irving websiteUrbanspace will operate a food hall on the ground level.

Long contested by local preservationists and community groups, the new building sits on the former site of a P.C. Richard & Son on city-owned property.

Wednesday, August 11, 2021

Craft beer specialists Top Hops on tap for Zero Irving food hall

Urbanspace signed a lease last August to operate a food hall on the ground level of Zero Irving (formerly the Union Square Tech Training Center, 14 @ Irving and tech hub) on 14th Street. 

And now we know at least one of the incoming vendors. The owners of Top Hops Beer Shop were expected to be on this month's CB3-SLA docket (Aug. 16) to operate a bar-restaurant inside the 21-story building at 124 E. 14th St. at Irving Place. 

According to the questionnaire on file at the CB3 website, this location will feature 18 tables to accommodate 97 guests and an 18-seat bar. Top Hops is also applying for a backyard garden space here. The food items on the sample menu include various sandwiches, burgers and dinner platters (bratwurst!).

Top Hops currently operates outposts in Essex Market and Urbanspace at 570 Lex. Their flagship shop/bar at 94 Orchard St. closed in March after nine years on the block below Delancey.

Here's more about the Zero Irving food hall via the official news release last summer:
Urbanspace will be a unique amenity for Zero Irving's tenants, users of the building’s event space, and the surrounding neighborhood. Urbanspace plans an innovative mixed online/offline platform that stays true to its exceptional, immersive food hall experience while providing enhanced online ordering with delivery and pickup options for building tenants and the local community. 

Urbanspace also plans a catering option offered to both building tenants and users of Zero Irving's event and conference center...
The building, developed jointly by the city’s Economic Development Corp. and RAL Development Services, will feature 14 floors of market-rate office space as well as "a technology training center and incubator, co-working spaces and state-of-the-art event space ... on the seven floors beneath," per the Zero Irving website

Long contested by local preservationists and community groups, the new building sits on the former site of a P.C. Richard & Son on city-owned property.

Zero Irving is expected to be completed by the end of the year.

Monday, April 26, 2021

Glass acts: Zero Irving gets its rooftop Sky Lounge

Here's our first look at 124 E. 14th St., aka Zero Irving (and formerly the Union Square Tech Training Center and 14 @ Irving ... and tech hub) since the start of the year.

EVG regular Pinch pointed out that the 21-story building is all glassed up these days. And it looks like that tenant-only rooftop Sky Lounge is coming together. 

Here's what the latest Zero Irving e-newsletter has to say: "Bulkhead permanent roofing installation for the roofing membrane work is ongoing. Layout for drilling for connections and installation of perforated steel panels is ongoing."

Roofing membrane!
A February article in Fortune included Zero Irving in a piece on "what the COVID-safe skyscraper will look like." Per the article:
The building is equipped with state-of-the-art touchless technology that will allow tenants to enter the building using an app on their phones. The app will open the building’s electric revolving doors, get tenants through security turnstiles automatically, and arrive at their floor through elevators equipped with destination dispatch — all without touching a thing.
Zero Irving is expected to open later this year.

And some of the background on the project...

The building, developed jointly by the city’s Economic Development Corp. and RAL Development Services, will feature 14 floors of market-rate office space as well as "a technology training center and incubator, co-working spaces and state-of-the-art event space ... on the seven floors beneath," per the Zero Irving announcement issued last October. Food-hall specialists Urban­Space officially signed the lease for 10,000 square feet on the ground level late last summer.

The new building — long contested by local preservationists and community groups (see links below) — sits on the former site of a P.C. Richard & Son on city-owned property.

Tuesday, January 5, 2021

2021 development watch: 124 E. 14th St.

Here's a start of January 2021 look at 124 E. 14th St., aka Zero Irving (and formerly the Union Square Tech Training Center and 14 @ Irving ... and tech hub) ...
It's a development to watch in 2021 as the building moves closer to occupancy

Work has moved quickly here (in the grand scheme of things). Workers topped out here back in the fall... roughly when the leasing began.

The latest Zero Irving e-newsletter states the rooftop scaffolding has been removed. Also!
Bathroom tile installation has begun on the 14th floor and will continue moving up the building as available. The painter will be priming walls on the 11th and 12th floors. Lobby framing and rough-in work has commenced and will continue throughout this period.
The 21-story building, developed jointly by the city’s Economic Development Corp. and RAL Development Services, will feature 14 floors of market-rate office space as well as "a technology training center and incubator, co-working spaces and state-of-the-art event space ... on the seven floors beneath," per the Zero Irving announcement issued last October. Food-hall specialists Urban­Space officially signed the lease for 10,000 square feet on the ground level late last summer.

And if you want to hear more, reps from RAL will be providing an overview tomorrow evening to CB3's Economic Development Committee. The item provides this: "status update on construction and upcoming leasing opportunities." (Zoom meeting info is at the CB3 website.)

The new building — long contested by local preservationists and community groups (see links below) — sits on the former site of a P.C. Richard & Son on city-owned property.

Previously on EV Grieve:
• Behold Civic Hall, the high-tech future of Union Square — and NYC

• Speaking out against a 'Silicon Alley' in this neighborhood

• City Council unanimously approves tech hub; some disappointment in lack of zoning protections 

• The conversation continues on the now-approved tech hub for 14th Street

• P.C. Richard is gone on 14th Street; preservationists want answers about tech-hub commitments

Tuesday, September 15, 2020

Reaching the top at Zero Irving (aka tech hub)



Here's what is turning out to be a monthly look at 124 E. 14th St., aka Zero Irving (and formerly the Union Square Tech Training Center and 14 @ Irving ... and tech hub for life!) ... workers are apparently up to the tippy top here at Irving Place...






The latest Zero Irving e-newsletter (14th @ Irving Construction Update #36, and, by the way, #2 is already a collector's item) states the following updates:

Superstructure Concrete
The project’s superstructure contractor will be completing the 23rd floor slab the week of 9/7. They will continue to place stairs at the top of house, in addition to mechanical pads, curbs and the buildings parapets. Upon completion of this miscellaneous concrete the contractor will begin demobilization. This will include cocoon removal, removal of shoring and decking material and other demobilization tasks.

Cellar
The project’s electrical contractor is finishing installation of Switchgear Room equipment and feeder conduits in coordination with Con Ed’s site visits. End line boxes will be completed, along with overhead conduits throughout the cellar. Con Ed is anticipated to complete their pulls and tie-ins to switch gear room. The project is expecting permanent power by October 2020.

General Site
The project’s mechanical, electrical, plumbing and fire protection contractors continue work on site to install sleeves and layout embeds and all other materials being placed into the deck on the 23rd floor. 
The newsletter makes mention of the 23rd floor. The official press release about the project lists this as a 21-floor building. Other news stories mention 21 floors too. The work permit lists 22 floors. Perhaps this 23rd floor mentioned is bulkhead-related. 

The 21-23-story building, developed jointly by the city’s Economic Development Corp. and RAL Development Services, will feature 14 floors of market-rate office space as well as "a technology training center and incubator, co-working spaces and state-of-the-art event space ... on the seven floors beneath," per the Zero Irving announcement issued last October. Food-hall specialists Urban­Space officially signed the lease for 10,000 square feet on the ground level last month.

The new building — long contested by local preservationists and community groups (see links below) — sits on the former site of a P.C. Richard & Son on city-owned property.

Previously on EV Grieve:
• Behold Civic Hall, the high-tech future of Union Square — and NYC

• Speaking out against a 'Silicon Alley' in this neighborhood

• City Council unanimously approves tech hub; some disappointment in lack of zoning protections 

• The conversation continues on the now-approved tech hub for 14th Street

• P.C. Richard is gone on 14th Street; preservationists want answers about tech-hub commitments


Monday, August 10, 2020

Zero Irving getting closer to the top; first sign of the glassy exterior



Workers have reached the 18th floor here at Zero Irving (aka tech hub) on 14th Street. When completed, the building at Irving Place will feature 21 floors...



Also! The first section of the large glass curtain wall on the north-facing front is now in place...



In other recent news here, food-hall specialists Urban­Space officially signed the lease for 10,000 square feet on the ground level.

Per the Post on Friday:

The new Urbanspace, the fifth in Manhattan, will differ from the others in having interactive online ordering in addition to traditional "curated" food stands. It is set to open in the first or second quarter of 2021.

And of arriving in what will likely be a difficult food-retail environment? "We have the ideal business model to help the New York culinary world recover," Urbanspace founder and president Eldon Scott told the Post without offering specifics.

The building, developed jointly by the city’s Economic Development Corp. and RAL Development Services, will feature 14 floors of market-rate office space as well as "a technology training center and incubator, co-working spaces and state-of-the-art event space ... on the seven floors beneath," per the Zero Irving announcement issued last October.

The new building — long contested by local preservationists and community groups (see links below) — sits on the former site of a P.C. Richard & Son on city-owned property.

Previously on EV Grieve:
Behold Civic Hall, the high-tech future of Union Square — and NYC

Speaking out against a 'Silicon Alley' in this neighborhood

City Council unanimously approves tech hub; some disappointment in lack of zoning protections

The conversation continues on the now-approved tech hub for 14th Street

P.C. Richard is gone on 14th Street; preservationists want answers about tech-hub commitments

Monday, June 15, 2020

Tech hub nears halfway mark



Here's another in our periodic looks at the high-profile Zero Irving (aka tech hub) on 14th Street at Irving Place.

Construction here was deemed essential, and work restarting on the site in early May.

According to the 14th @ Irving Construction e-newsletter out this past Friday, work is up to the 10th level of what will be a 21-floor building.

And if you want some super specifics:

The project’s superstructure contractor will complete wall systems cycle for forms on Level 9 (supporting level 10), strip forms on deck below, install rebar in wall forms and close walls starting from East to West. It is anticipated that the East walls will be poured on Wednesday 6/17 and West on Thursday 6/18.

And!

The project’s mechanical, electrical, plumbing and fire protection contractors continue work on site to install sleeves and layout embeds and all other materials being placed into the deck. Stairs and fire standpipes will continue to jump with the building progress, staying (2) floors behind working deck. Plumbing Rough-in work is ongoing on the 2nd and 3rd floors. Fuel oil and storm risers will be installed up through 8th floor. Water risers and duct risers are expected to be up to the 5th floor by 6/26.



The building, developed jointly by the city’s Economic Development Corp. and RAL Development Services, will feature 14 floors of market-rate office space as well as "a technology training center and incubator, co-working spaces, state-of-the-art event space, and street level food hall on the seven floors beneath," per the Zero Irving announcement issued last October.



The new building sits on the former site of a P.C. Richard & Son.

Previously on EV Grieve:
P.C. Richard is gone on 14th Street; preservationists want answers about tech-hub commitments

Friday, May 17, 2019

Prepping the former P.C. Richard & Son for demolition on 14th Street



Workers started prepping the former P.C. Richard & Son two-story compound on 14th Street at Irving Place yesterday for demolition (thanks for the photo Pinch!) ... clearing the site for the eventual construction of the 22-story Union Square Tech Training Center (aka tech hub).

The project is being developed jointly by the city’s Economic Development Corp. and RAL. The Union Square Tech Training Center includes Civic Hall, which will offer digital skills for low-income residents, as well as market-rate retail, office space and a food hall.


[Image via Davis Brody Bond]

The hub, championed by Mayor de Blasio and initially announced in early 2017, passed through the city’s Uniform Land Use Review Process earlier in 2018, capped off by a unanimous City Council vote in August. A rezoning was required to build the the structure, which is larger than what current commercial zoning allows.

The 14th @ Irving website lists a grand opening in the fourth quarter of 2020, though that timeline is already slightly off schedule — construction was expected to start in the first quarter of this year.

The Village Preservation (GVSHP) recently called for a probe of the "sweetheart deal" that RAL Development Services, the developer of the tech hub, received here.

Previously on EV Grieve:
Behold Civic Hall, the high-tech future of Union Square — and NYC

Speaking out against a 'Silicon Alley' in this neighborhood

P.C. Richard puts up the moving signs on 14th Street; more Tech Hub debate to come

Preservationists: City schedules next public hearing on tech hub without any public notice

City Council's lone public hearing on the 14th Street tech hub is tomorrow

City Council unanimously approves tech hub; some disappointment in lack of zoning protections

The conversation continues on the now-approved tech hub for 14th Street

Report: Preservationists want probe of the tech hub deal on 14th Street

Monday, May 6, 2019

Report: Preservationists want probe of the tech hub deal on 14th Street


[Photo from Saturday]

The Village Preservation (GVSHP) is calling for a probe of the "sweetheart deal" that the developer of the tech hub received on 14th Street.

As the Daily News first reported yesterday, the GVSHP explored the paperwork behind the project, pointing out that the developer, RAL Development Services, will pay $1.6 million a year for the first five years ... then $2.3 million annually in the five years after that while the previous tenant, P.C. Richard & Son, paid $1.7 million in annual rent for the two-story building.

GVSHP Executive Director Andrew Berman told this to the News:

"It seems highly suspect that the developer of a 21-story office tower is paying barely more than the operator of a 2-story appliance and electronics store for use of this incredibly valuable land. This is and has been from the beginning a sweetheart deal for political allies of and donors to the mayor. There was absolutely no transparency to the process by which RAL were chosen to get this incredibly valuable piece of public land for a song."

And...

Berman pointed to a lack of any documented evaluations of bids on the development deal, which is supported by the results of Freedom of Information requests made by his group to the city’s Economic Development Corporation. In response to a request for notes, ratings or a scoring sheet regarding the selection of RAL over several other applicants, EDC responded that it located "no responsive records."

The GVSHP also found through campaign finance records that Andrew Rasiej, CEO of Civic Hall — RAL’s partner in the development — donated at least $8,000 to Mayor de Blasio since 2004. Meanwhile, RAL was also supportive of de Blasio's now-defunct nonprofit Campaign for One New York, giving at least $10,000 in 2015, as the News reported.

And the city's response? "The best applicant was chosen," Jane Meyer, a spokesperson for the Mayor, told the News, adding that the donations had nothing to do with RAL's selection.

As for more background, it took nearly nine months for the proposed tech hub — now called the Union Square Tech Training Center — to wind through the city’s Uniform Land Use Review Procedure, culminating with the City Council's OK last August. (A rezoning was required to build the the 22-story structure, which is larger than what current commercial zoning allows.)

The Department of Buildings approved the permits for the new structure on Feb. 26, just three months after they were first filed.

Construction work was expected to start in this first quarter of 2019, per the 14th @ Irving website. But first, the former P.C. Richard & Son outpost was to be demolished. (The 14th @ Irving website now states that "site mobilization and protection" will start today.)

The project is being developed jointly by the city’s Economic Development Corp. and RAL. The Union Square Tech Training Center includes Civic Hall, which will offer digital skills for low-income residents, as well as market-rate retail, office space and a food hall.

Mayor de Blasio first unveiled the renderings publicly in February 2017.

I asked Berman what he hopes the next steps are after the disclosure in the News yesterday.

"My hope is that there would be some sort of review of the process by which this bidder was chosen, whether or not it was based on the merits and in the best interests of the people of the City of New York," he said in an email.

Previously on EV Grieve:
Behold Civic Hall, the high-tech future of Union Square — and NYC

Speaking out against a 'Silicon Alley' in this neighborhood

P.C. Richard puts up the moving signs on 14th Street; more Tech Hub debate to come

Preservationists: City schedules next public hearing on tech hub without any public notice

City Council's lone public hearing on the 14th Street tech hub is tomorrow

City Council unanimously approves tech hub; some disappointment in lack of zoning protections

The conversation continues on the now-approved tech hub for 14th Street

1st signs for the future tech hub arrive on 14th Street; more details emerge about 14th @ Irving

New building permits pre-filed for the (slightly larger) tech hub on Union Square

City OKs new building permits for mayor's tech hub on 14th Street

Wednesday, February 27, 2019

City OKs new building permits for mayor's tech hub on 14th Street


[EVG photo from last month]

It took nearly nine months for the proposed tech hub — now called the Union Square Tech Training Center — on 14th Street at Irving Place to wind through the city’s Uniform Land Use Review Procedure, culminating with the City Council's OK last August. (A rezoning was required to build the the 22-story structure, which is larger than what current commercial zoning allows.)

And it took far less time for the Department of Building's (DOB) to approve the new building permits for the 22-floor building. DOB records show that the city signed off on the project yesterday.



The new building permits were just filed this past Nov. 19. (For a comparison, new building permits for the 9-story development planned for the former Sunshine Cinema on East Houston are still waiting for approval. Permits were first filed in March 2018, per city records.)

Work is expected to start in this first quarter of 2019, per the 14th @ Irving website. But first, the former P.C. Richard & Son outpost needs to be demolished.

As previously reported, the project is being developed jointly by the city’s Economic Development Corp. and RAL Development Services. The Union Square Tech Training Center includes Civic Hall, which will offer digital skills for low-income residents, as well as market-rate retail, office space and a food hall.

Mayor de Blasio first unveiled the renderings publicly in February 2017.


[Image via Davis Brody Bond]

Previously on EV Grieve:
Behold Civic Hall, the high-tech future of Union Square — and NYC

Speaking out against a 'Silicon Alley' in this neighborhood

P.C. Richard puts up the moving signs on 14th Street; more Tech Hub debate to come

Preservationists: City schedules next public hearing on tech hub without any public notice

City Council's lone public hearing on the 14th Street tech hub is tomorrow

City Council unanimously approves tech hub; some disappointment in lack of zoning protections

The conversation continues on the now-approved tech hub for 14th Street

1st signs for the future tech hub arrive on 14th Street; more details emerge about 14th @ Irving

New building permits pre-filed for the (slightly larger) tech hub on Union Square

Monday, January 14, 2019

Permits filed to demolish former P.C. Richard & Son property to make way for the tech hub



Reps for RAL Development Services filed permits with the city back on Friday to demolish the former P.C. Richard & Son store on 14th Street at Irving Place.

This is just a formality as work is expected to start in the first quarter of 2019 on the tech hub, aka 14th @ Irving. (The new building permits were filed in November. That is still awaiting approval.)

As previously reported, the project is being developed jointly by the city’s Economic Development Corp. and RAL Development Services. The 240,000-square-foot building includes Civic Hall, which will offer tech training for low-income residents, as well as market-rate retail, office space and a food hall.

The hub, initially announced in early 2017, passed through the city’s Uniform Land Use Review Process earlier in 2018, capped off by a unanimous City Council vote in August. A rezoning was required to build the the 21-story (or 22?) structure, which is larger than what current commercial zoning allows.


[Image via Davis Brody Bond]

Previously on EV Grieve:
Behold Civic Hall, the high-tech future of Union Square — and NYC

Speaking out against a 'Silicon Alley' in this neighborhood

P.C. Richard puts up the moving signs on 14th Street; more Tech Hub debate to come

Preservationists: City schedules next public hearing on tech hub without any public notice

City Council's lone public hearing on the 14th Street tech hub is tomorrow

City Council unanimously approves tech hub; some disappointment in lack of zoning protections

The conversation continues on the now-approved tech hub for 14th Street

1st signs for the future tech hub arrive on 14th Street; more details emerge about 14th @ Irving

New building permits pre-filed for the (slightly larger) tech hub on Union Square

Monday, November 19, 2018

New building permits pre-filed for the (slightly larger) tech hub on Union Square



The first permit was filed last Thursday for the new building that will house the Union Square Tech Training Center (aka the tech hub and 14th @ Irving).

Renderings for the tech hub arrived at the former P.C. Richard & Son property on 14th Street at Irving Place earlier this month. Previous reports on the building, including the city's own news release, listed the 258,000 square-foot project at 21 floors.

However, the permit on file with the DOB lists 22 floors and 309,000 square feet...



Not sure what accounts for the discrepancy. The Schedule A on the permit shows that the 22nd floor is for elevator machinery rooms, the boiler room and the generator switchboard room.

Meanwhile, there's nothing on file yet with the DOB about demolishing the existing building.

As previously reported, the project is being developed jointly by the city’s Economic Development Corp. and developer RAL Development Service. The building includes Civic Hall, which will offer tech training for low-income residents, as well as market-rate retail, office space and a food hall.


[Image via Davis Brody Bond]

The hub, initially announced in early 2017, passed through the city’s Uniform Land Use Review Process (ULURP) earlier this year, capped off by a unanimous City Council vote in August. A rezoning was required to build the the 2122-story structure, which is larger than what current commercial zoning allows.

For months, some residents, activists, small-business owners and community groups expressed concern that the rezoning necessary for the project would spur out-of-scale development on surrounding blocks. (You can read more about what transpired in the links below.)

The 14th @ Irving website states that construction will start in the first quarter of 2019, with the building opening in the fourth quarter of 2020.

Construction on an already-congested thoroughfare will coincide with the L-train closure starting in April 2019, when 14th Street is expected to serve as a (mostly) car free busway for displaced subway commuters.

Previously on EV Grieve:
Behold Civic Hall, the high-tech future of Union Square — and NYC

Speaking out against a 'Silicon Alley' in this neighborhood

P.C. Richard puts up the moving signs on 14th Street; more Tech Hub debate to come

Preservationists: City schedules next public hearing on tech hub without any public notice

City Council's lone public hearing on the 14th Street tech hub is tomorrow

City Council unanimously approves tech hub; some disappointment in lack of zoning protections

The conversation continues on the now-approved tech hub for 14th Street

1st signs for the future tech hub arrive on 14th Street; more details emerge about 14th @ Irving

Monday, November 5, 2018

1st signs for the future tech hub arrive on 14th Street; more details emerge about 14th @ Irving



Renderings for the incoming Union Square Tech Training Center now adorn the former P.C. Richard & Son property on 14th Street at Irving Place, site of the mayor's so-called tech hub.



The renderings here show that the 21-story building — "a community and collaborative work and event center" — is going by 14th @ Irving, a name that was first introduced in December 2016 though not always mentioned in more recent news accounts on the project.





The 14th @ Irving website has details on what to expect here, like the Food Hall:

The Food Hall will enhance the street life and activate the mid-block area on 14th Street between 3rd and 4th avenues. Food and other vendors will provide amenities to the local community and the building tenants. 25% of all booths will be reserved for first time, local entrepreneurs and new businesses. The event space within the building will also provide catering opportunities to help support these new businesses while the digital skills training center will provide access to training to both vendors and employees.

As previously reported, the project is being developed jointly by the city’s Economic Development Corp. and developer RAL Development Service. The 240,000-square-foot building includes Civic Hall, which will offer tech training for low-income residents, as well as market-rate retail and office space.



The hub, initially announced in early 2017, passed through the city’s Uniform Land Use Review Process (ULURP) earlier this year, capped off by a unanimous City Council vote in August. A rezoning was required to build the the 21-story structure, which is larger than what current commercial zoning allows.

For months, some residents, activists, small-business owners and community groups expressed concern that the rezoning necessary for the project would spur out-of-scale development on surrounding blocks. (You can read more about what transpired in the links below.)

The 14th @ Irving website states that construction will start in the first quarter of 2019, with the building opening in the fourth quarter of 2020. To date, there aren't any permits filed for the address at the DOB website.


[Image via Davis Brody Bond]

Previously on EV Grieve:
Behold Civic Hall, the high-tech future of Union Square — and NYC

Speaking out against a 'Silicon Alley' in this neighborhood

P.C. Richard puts up the moving signs on 14th Street; more Tech Hub debate to come

Preservationists: City schedules next public hearing on tech hub without any public notice

City Council's lone public hearing on the 14th Street tech hub is tomorrow

City Council unanimously approves tech hub; some disappointment in lack of zoning protections

The conversation continues on the now-approved tech hub for 14th Street