Workers this afternoon have removed the barricades from outside the NW corner of the Foundation Building on Cooper Square after three months of sidewalk/concrete repairs ... looks pretty smooth for skating!
ALL of them are terribly constructed. [This is] the one on Avenue B and 10th Street, southwest corner.
You'll notice that the new ramp is not flush with the street, so the gap was filled in with some sloppily placed extra concrete. This is at every new curb ramp, and most of them are worse than the one pictured here. I imagine many of these will have pooling when it storms.
Is this a case of a sloppy contractor who does bad work without repercussion? Or did the contractor do it properly per spec and these streets are going to get milled and repaved soon and will then be flush to the ramp?