We first reported that developer Ben Shaoul was adding three new floors of residences at 31-33 Second Ave. back in June 2012...
Here's a quick look at the progress...

The sidewalk bridge is sporting some renderings of the final product, expected in the first quarter of 2014...


Approved plans on file with the city show that workers will remodel the existing commercial space on the ground floor ... remodel the existing apartments on the 2nd and 3rd floors ... and add on top of the existing building. Each floor will contain two apartments. Based on the rendering, the original building will be stripped of all character to make it appear as if it belongs on a train set.
Previously on EV Grieve:
Ben Shaoul planning a 3-story addition at 31-33 Second Ave.
Bracing for 3 new floors at 31-33 Second Ave.